
House of Glass,Jake prepares the track.

House of Glass,Brian at work.

House of Glass,Curtain wall panels ready to install.

House of Glass,Side of evo.

Mud Men,The workers pour the concrete.

Mud Men,Northwest side of Evo building.

Mud Men,Southeast side of Evo building.

Mud Men,Rebar ends.

Mud Men,The workers stand in the cement.

Mud Men,The workers pour concrete.

Mud Men,Highlighted balcony section above pool deck.

Mud Men,Northwest side of Evo building with elevator cores highlighted.

Pipe Pullers,A plumber's blueprint book.

Pipe Pullers,Water super highway.

Pipe Pullers,A working starts cutting off the end of a pipe.

Pipe Pullers,Ceiling waterworks join pipes on the ceiling.

Race to the Finish,Kitchen cabinet layout.

Race to the Finish,Otis guys onto of the elevator motors.

Race to the Finish,Cabinet installation underway.

Race to the Finish,Installing Harwood floors.

Race to the Finish,Protecting cabinets.

Rodbusters,A contractor runs cables through the wall frames.

Rodbusters,Initial columns.

Rodbusters,Computer generated image of a building.

Rodbusters,Computer generated image of a building.

Rodbusters,Overhead rebar layout.

Rodbusters,A building under construction reaches the 9th floor.

Rodbusters,Computer generated image of a building.

Rodbusters,Floor in progress.

Sparkies,Danger sign.

Sparkies,BTS cable pull from parking level.

Sparkies,Preparing power outlets.